Skip to content

Estimate CBAM charge

Estimates the UK CBAM charge for declaration lines from HMRC goods lists, default values and rates, with the data version behind each row.

@lainstack/uk-cbam/estimate-charge · Customs · Available on Lainstack Cloud

Use Estimate CBAM charge to estimate the UK Carbon Border Adjustment Mechanism (CBAM) charge for declaration lines. It needs no connection. The result is an estimated charge, not what an importer owes. Lainstack prepares figures; it does not file a CBAM return or act as the importer’s representative.

How it works, from HMRC’s guidance:

  • UK CBAM applies to goods imported from 1 January 2027. A line is in scope when its commodity code falls under a heading in HMRC’s goods list, unless an Except row takes it out.
  • Embodied emissions are net tonnes times the emissions intensity (tCO2e per tonne): the supplier’s verified figure, else HMRC’s default for the 8-digit code, whatever the origin.
  • The estimated charge is the embodied emissions times HMRC’s rate for the sector and the import quarter, before carbon price relief.
  • Only direct emissions count, with those embodied in precursor goods and without electricity. Enter a supplier figure on that basis.
  • Rates are illustrative until HMRC publishes final ones. Rows that use them say so.

Settings:

  • Lines: a Table or List from an earlier step. Pick the columns for the commodity code (8 or 10 digits), net mass, import date (YYYY-MM-DD) and, optionally, origin and the supplier’s emissions intensity. Origin does not change the estimate.
  • Net mass is in: kilograms or tonnes, used when the mass column has no unit of its own.

Results:

  • Estimates: a row per line assessed, in scope or not, with the HMRC row and sector, emissions, intensity source, rate, quarter, estimated charge, and the data version and source used.
  • Not estimated: a row per line with a bad value, no data in force for its date (before 2027, or a quarter without a rate), or no default value and no supplier figure. Another date’s data is never used.
  • Total estimated charge, and Uses illustrative rates.
Setting Key Type Details
Lines (required) lines Value A Table or List from an earlier step, one row for each declaration line.
Commodity code (required) codeColumn List The 8 or 10 digit commodity code. Spaces and dots are ignored. At most 8 items.
Net mass (required) massColumn List The net mass of the goods. A column with a weight unit is read in that unit; otherwise the unit chosen below applies. At most 8 items.
Import date (required) dateColumn List The date written YYYY-MM-DD. It picks the rate’s quarter. At most 8 items.
Origin originColumn List Optional. Kept on the results; HMRC’s default values do not depend on the origin. At most 8 items.
Supplier’s emissions intensity supplierIntensityColumn List Optional. The supplier’s verified figure in tCO2e per tonne: direct emissions with precursors, without electricity. A line without one uses HMRC’s default value. At most 8 items.
Net mass is in massUnit One of Kilograms, Tonnes Used when the mass column has no unit of its own.
Output Path Type
Estimates estimates Value
Not estimated notEstimated Value
Total estimated charge (£, before relief) totalEstimatedCharge Number
Uses illustrative rates usesIllustrativeRates Yes or no