Skip to content

Import through a roll-on roll-off port, from declaration to clearance

This recipe follows one lorry load into Great Britain through a port that uses HMRC’s Goods Vehicle Movement Service (GVMS), such as Dover or the Channel Tunnel. It runs from the import declaration before departure to the goods clearing on arrival, and covers the two things that interrupt it: an inspection, and a goods movement record (GMR) that can’t check in.

It puts together the import declaration recipe and the GVMS recipe. Read those for how to read the invoice, set up the tables and connect HMRC as the haulier. This one is about how the pieces fit on the day.

HMRC arrives the declaration when the lorry embarks, so no arrival notification is sent.

At a GVMS port the declaration goes straight to HMRC and the GMR carries it through the port. Imports at ports and airports with their own cargo systems, such as most container ports, go through that port’s system instead, and this recipe doesn’t apply there.

When What happens Which block
Before departure The declaration is pre-lodged and HMRC issues its MRN Send CDS declaration
Before check-in The GMR is created with the MRN, and the driver gets the GMR ID Send goods movement record
Check-in The carrier checks the GMR. Only a GMR that is ready can board None: the carrier does this
Embarkation GVMS arrives the declaration in CDS. HMRC then decides on it during the crossing None: HMRC does this
During or after the crossing HMRC says whether the goods are clear or must be inspected Wait for goods movement
After clearance The declaration is released Get CDS declaration status

Build the declaration as in the import recipe, with these settings for a GVMS crossing:

  • Type: Before arrival, pre-lodged (IMD). HMRC requires imports through GVMS ports to be pre-lodged.
  • Wait until: Received (MRN issued). HMRC issues the MRN as soon as it has the declaration, but accepts it only once the goods arrive. The block continues on Accepted with the MRN, so the GMR can be made.
  • Goods location: the port’s GVMS code from HMRC’s Appendix 16S, such as DVRDOVDVRGVM for Dover. GVMS codes end in GVM, and with one the block adds the additional information code RRS01 that HMRC requires on these declarations.

The declaration goes from the trader’s HMRC connection. The GMR in the next step goes from the haulier’s.

Add Send goods movement record on the send block’s Accepted exit:

  • Action: Create a GMR.
  • Direction: Into Great Britain.
  • Load: Goods under customs declarations, with the send block’s MRN in Customs declarations. A lorry carrying several consignments lists every MRN.
  • Route ID, Departure (local time) and the vehicle, trailers or containers: from the trigger, as in the GVMS recipe.

On Accepted the GMR is open and ready for check-in: give the GMR ID to the driver. On Needs changes HMRC needs more first; see Fix what HMRC flags.

3. No arrival notification on a GVMS route

Section titled “3. No arrival notification on a GVMS route”

Update CDS declaration has a Goods have arrived action, which tells HMRC that the goods of a pre-lodged declaration have arrived. You don’t need it here. HMRC’s GVMS guidance says that when the lorry embarks, GVMS arrives the declarations on its GMR in CDS automatically.

Keep Goods have arrived for pre-lodged declarations whose goods don’t travel on a GMR.

Add Wait for goods movement on the GMR’s Accepted exit, with the GMR ID. Set Give up after (minutes) to cover the time until the lorry has crossed and been cleared. It defaults to a day and can go up to a week.

It leaves on:

  • Cleared: the lorry has crossed and HMRC says the goods are clear to proceed.
  • Inspection required: see step 5.
  • Needs changes: the GMR can no longer check in, see step 6.
  • Timed out: nothing happened within the time limit. Check the GMR with HMRC and run the block again.

HMRC decides during the crossing whether the goods must be inspected, and the haulier hears about it on the GMR. The block’s output lists the inspection locations to report to, from HMRC’s GVMS reference data. Depending on the port, the driver goes to a check in the port or at an inland border facility.

Connect an Approval to Inspection required, with the locations in its Request. Whoever deals with the driver tells them where to report, and approves once the inspection is over. Then add a second Wait for goods movement with the same GMR ID, so the run keeps following the GMR until the goods clear. If it leaves on Inspection required again, HMRC hasn’t cleared the inspection yet.

A GMR that HMRC marks not finalisable can’t check in. The Rule failures under GMR say why. For example, a declaration on it was cancelled or rejected.

  • Before check-in: fix the cause, then send the GMR again with Action set to Update a GMR and the GMR ID. An update replaces the whole record, so send every field again. If the declaration was rejected, send a new one first and put its MRN on the GMR.
  • After check-in: a GMR can’t be updated or deleted any more.

Cleared is the GMR’s state. To see the declaration’s own state, add Get CDS declaration status with the MRN from step 1. Status under Declaration reads released once the goods are released.

The send block left on Received, so it doesn’t report what happens to the declaration later. If it isn’t released yet, follow it with Track CDS declaration status. If customs asks for documents, see Answer a customs hold.

  • An arrived declaration (IMA). GVMS ports take pre-lodged imports only.
  • A goods location that isn’t a GVMS code. The declaration carries no RRS01.
  • Waiting for Accepted. With Wait until set to Accepted the send block waits for an arrival that only the GMR can bring, and ends on Timed out. Use Received.
  • Two connections, two identities. The declaration goes from the trader’s connection and the GMR from the haulier’s. HMRC shows a haulier only their own GMRs, and answers about a declaration only to the trader who submitted it.
  • A GMR that expires. It expires 28 days after its last update. Create it close to the crossing.
  • A cancelled declaration. Cancelling a declaration that is on an open GMR makes the GMR not finalisable. Update the GMR.

Last updated: